Farshad Majzoubi
132 Eastern Pkwy #211 RTDSS Lab, Louisville KY 40208
USA
Cell: 502-599-3602
http://rtdss.louisville.edu/people/Farshad%20Majzoubi.aspx
Email:
fmajzoubi@gmail.com
EDUCATION
University
of Louisville,
Louisville,
KY
Fall 2009- Present
Industrial
Engineering, GPA 3.8/4.0 Expected
Graduation Date: May 2013
Sharif
University of Technology, Tehran,
Iran
2009
Industrial
Engineering
Tehran
Polytechnic Tehran, Iran
2006
Manufacturing
Engineering
PROFESSIONAL EXPERIENCE
Logistics and
Distribution Institute
Nov 2009-Present
Research Assistant
Project: Inventory and Production Planning of Cardinal
Printing
Company
Apr 2012- Jan 2013
-
Data Analysis in M.S Excel to
estimate the demand for each product
-
Decision making about making to stock or
making to order for each product
-
Applied EPQ and a heuristic method to
determine the production quantity of each product
-
Developed a discrete event simulation
model in Arena to model the production line of the company
-
Designed an inventory control model and
implemented it in C#/CPLEX to identify optimal inventory level
Results: Average cost
reduction of 15% one year period
Project: Scheduling Transportation of Patients to Hospitals in
a Pandemic Nov 2009-Nov 2012
-
Conducted data analysis and regression
to estimate time of call and travel time patterns in SAS 9.1.
-
Conducted data mining techniques
to classify the calls using decision trees and Bayesian classifiers in Weka
-
Algorithm development using heuristics
in C# to and used event based simulation model to test the model
-
Developed a 24/7 real-time decision
supporting web tool that utilized advanced algorithms, C#, SQL Server,
and GIS routing software
Results: A real-time
decision support web tool (www.rtdss.org)
for dispatching EMS vehicles planned to be used in Louisville EMS call center
,
more than 30% improvement in average estimated travel using proposed
scenarios
Project: Redesigning the Yard of Jeff Boat
Company
Jan 2010- Jun 2010
-
Data Analysis of material flow data in M.S.
Excel
-
Redesigned the Layout based on the
material flow, distance and cost
-
Determining Number of forklift trucks
required for the new system
-
Prepared a recommendation list to
improve the overall material flow process
Results: Approximately 40% materiel
flow reduction
Sarvand Urban Planning Company,
Tehran
Mar 2008-Feb 2009
Industrial Engineer
-
Documentation of main
processes, developing procedures, work instructions, controlling records and
designing forms.
-
Responsible for
implementing ISO 9000 standard and project management
-
Scheduling and tracking
projects using Microsoft Project
- Data Analysis of projects using Microsoft
Excel/VBA
-
Working with SPC
control charts for quality control of the projects
- Preparing reports for stakeholders
showing the overall progress of projects and completion of milestones.
Results: 10% cost reduction in overall annual cost of the projects, and meeting 80% of milestones of the projects (20% improvement)
SAIPA Automotive Manufacturer, Tehran
Jun 2005-Nov 2005
Manufacturing Engineer
-
Working with SPC control charts and
worked with c-bar and s-bar control charts using Minitab
-
Participated in System
Synchronization Value Stream Map project.
-
Developed work instructions for
operators in continuous improvement project
-
Gained experience in employing 5S, and
Lean Production system and continuous improvement (Kaizen)
COMPUTER SKILLS
Statistics
and Data
Mining
SAS, WEKA and Minitab
Programming
C#, C++, VB. Net
Optimization
CPLEX (OPL and ILOG/Concert) and LINGO
Simulation Software:
Arena and General Purpose Software Simulation (GPSS)
Database:
SQL Server and M.S. Access
Project Management:
Microsoft Project and Primavera Project Planner
General software:
Microsoft Word, Excel and PowerPoint
GIS Software:
Arc GIS
Certificate:
-
Certified
ISO 9000:2000, 19011:2002 Quality Management from TUV Rheinland Co. (
Germany)
-
Project
Management Certificate from Tehran Polytechnic University